TDEC's Self Disclosure Policy
Sample Request for Monetary Penalty Waiver
Compliance Advisory Panel
Emerg. Planning & Community Right to Know Act
Energy conservation and efficiency
Hazardous Air Pollutants list
Risk Mgt. Program - Clean Air Act Section 112(r)
Publications
Spill Prevention Control & Countermeasures Plan
What's new?
NESHAP (MACT) standards by affected source category
Asphalt
Hot Mix Asphalt Plants
Processing and Roofing Products Manufacturing
Boiler
Chemicals
Chemical Manufacturing
Drycleaning
Hospital Sterilizers
Metals
Al, Cu, and Nonferrous Foundries
Chromium Electroplating
Ferroalloy Production Facilities
Metal Fabrication and Finishing
Plating and Polishing
Paint
Paints and Allied Products Manufacturing
Surface Coating and Paint Stripping
Ready Mix Concrete
Reinforced Plastic Composites
Retail Gasoline Marketers
RICE Engines
Risk Management Program
Solid/Hazardous Waste
Storm Water Management
Construction: NPDES permit brochure
ECOS: Small Communities
Important Dates
Notification of Compliance Status
Annual Compliance Certification Report
Initial Notification
Who is and is not affected by the rule?
Quick Reference Documents
The Environmental Protection Agency published new regulations on July 1, 2008, that impact plating and polishing facilities. The Federal National Emission Standards for Hazardous Air Pollutants: Area Source Standards for Plating and Polishing Operations 40 CFR 63 Subpart WWWWWW rule (6W) was issued to reduce vapors from facilities that contain cadmium, chromium, manganese, nickel, lead, and other harmful chemicals. It does NOT affect facilities that are subject to 40 CFR 63 Subpart N National Emission Standards for Chromium Emissions from Hard and Decorative Chromium Electroplating and Chromium Anodizing Tanks. By July 1, 2010, facilities affected by the rule are required to be in compliance with the rule.
Initial Notification
Existing Facilities: October 29, 2008
New Facilities: within 120 days after becoming affected by rule
Notification of Compliance Status
Existing Facilities: July 1, 2010
New Facilities: upon startup of the affected source
Annual Compliance Certification Report
Prepared by January 31 of the year following the reported year. For existing sources, the first reported year would be 2010.
The Notification of Compliance Status report is required to be submitted by July 1, 2010 for existing facilities (constructed on or before March 14, 2008) to both the EPA Region IV and the State of TN Division of Air Pollution Control. New affected sources (commenced construction/reconstruction after March 14, 2008) must comply with the rule, and submit both an Initial Notification and a Notification of Compliance Status upon startup. This report provides information on what processes are affected by the rule and what the facility is doing to meet the requirements of the rule. A sample Notification of Compliance Status report is available.
To further assist a facility in determining their compliance requirements, a Compliance Checklist has been developed as an aid.
If you own or operate an affected source, you must prepare an annual compliance certification report by January 31st of the year immediately following the year to be reported. For existing sources, the first year to be reported is 2010 and the annual compliance certification report needs to be prepared by January 31, 2011. These reports do not need to be submitted unless a deviation from the requirements of this rule has occurred during the reporting year, in which case, the annual compliance certification report must be submitted along with the deviation report on the January following the year in which there was a deviation. Though the report does not need to be submitted unless there is a deviation, they still have to be prepared and kept onsite in the event that an inspector requests the report. The 6W rule requires recordkeeping in order to support the statements made in the annual compliance certification report. An example of the records needed and an annual compliance certification report is available.
The regulations require affected sources to notify regulatory agencies that the rule applies to them. This notification requirement is referred to as an Initial Notification and must be submitted to the TN Division of Air Pollution Control by October 29, 2008. You must state that the Notification is submitted to meet the requirements of the Federal National Emission Standards for Hazardous Air Pollutants: Area Source Standards for Plating and Polishing Operations 40 CFR 63 Subpart WWWWWW §63.11509(b) and 40 CFR 63 Subpart A, §63.9(b). A sample initial notification is available.
Existing source initial notifications are due not later than October 29, 2008, or within 120 calendar days after your Plating and Polishing Facility becomes subject to the rule, whichever is later.
This notification must be submitted by the owner or operator of a plating and polishing facility that:
» has emissions of less than 10 tons per year of any single hazardous air pollutant (HAP) or less than 25 tons per year of a combination of two or more HAPs.
» is engaged in one or more of the following processes:
• Electroplating (Non-cyanide)
• Continuous electroplating (noncyanide)
• Short-term electroplating (noncyanide)
• Electropolishing
• Electroforming
• Electroplating (cyanide)
• Electroless nickel
• Chrome conversion coating
• Other electroless plating/coating/dipping
• Thermal spraying (permanent line)
• Thermal spraying (temporary, in-situ)
• Dry mechanical polishing
If your facility is:
1. Subject to the requirements of 40 CFR part 63, subpart N (National Emission Standards for Chromium Emissions from Hard and Decorative Chromium Electroplating and Chromium Anodizing Tanks).
2. A research and development process unit, as defined in § 63.11511 of the enclosed rule.
3. Process units that are used strictly for educational purposes.
4. Thermal spraying conducted to repair surfaces.
5. Dry mechanical polishing conducted to restore the original finish to a surface.
6. Any plating or polishing process that does not use any material that contains cadmium, chromium, lead, or nickel in amounts of 0.1 percent or more by weight, or that contains manganese in amounts of 1.0 percent or more by weight, as reported on the Material Safety Data Sheet for the material.
• Notification of Compliance Status report
• Compliance Checklist
• Annual compliance certification report
• Letter explaining actions needed
• Sample initial notificaiton
• EPA Brochure on the Plating and Polishing Rule
Link to the complete rule for National Emission Standards for Hazardous Air Pollutants: Area Source Standards for Plating and Polishing Operations 40 CFR 63 Subpart WWWWWW