Paul E. Davis, Director
6th Floor, L & C Annex
401 Church Street, Nashville, TN 37243
(615) 532-0625
Questions? Ask WPC
EPA HQ Office of Water
EPA Region 4 Water Protection
Fleming Training Center Online Services
GIS & Mapping
Hydrologic Determinations and Certification of Hydrologic Professionals
TN Erosion Prevention and Sediment Control Training and Certification Program
Wastewater Reuse Inventory
Water Quality Complaints for Logging Activities
Water Quality Control Board
Water Resources Regional Planning
By Wendy Smith, Melanie Catania and Dan Eagar
Artwork by Geralda Shockey
Frequently Asked Questions || Stabilizing Streambanks || Keeping Streams Healthy || Permits
Stabilizing Streambanks
Streams change as they mature. And streams, like the plants and animals that live near them, must adjust to the changes in the landscape around them. Some of the impacts that can affect a stream are: trees that have fallen into the stream can cause the stream channel to change course the removal of shrubs and trees along the streambank which can cause streambanks to collapse brush and scrub timber pushed into the stream from a logging operation or development project which can cause streambank erosion increased paving and roofing in the watershed, which can increase the runoff rate causing flooding and streambank erosion downstream
Many landowners in Tennessee lose valuable streamside property to erosion. Fortunately there are many ways to solve streambank erosion problems. This brochure gives an overview of some of the solutions. For your particular stream, please contact your district conservationist or the TDEC Environmental Assistance Center near you. Phone numbers are provided on the back page.
|
Keep vehicles and equipment out of the stream whenever possible Keep trees and plants along streambanks Remove fallen logs and other woody debris from the stream channel by winching or dragging as soon as possible Provide a water source such as a pond or tank for livestock away from stream or provide controlled access to the stream at a stable location Allow your stream to establish a natural path and slope whenever possible Use anchored trees, rootwads, large rocks, plants and other natural materials to repair eroding banks Conduct ongoing maintenance to keep small problems from becoming big problems!
One successful method of streambank stabilization is known as bioengineering. Bioengineering uses natural materials such as trees, roots and logs to divert water away from a streambank and stabilize the bank. This drawing illustrates a cedar tree revetment project which uses live cedar trees anchored to the base or toe of the bank. Cedars are bushy and slow to rot. As sediment collects in their branches, they provide a natural seedbed for streamside trees such as willows and sycamores to take root and grow.
Over time this revetment is stabilized by the growing root systems of the willows and
sycamores and the streambank is restored.
A simple method to hasten the establishment of stream bank protection is to use live willow stakes cut during winter.
Other bioengineering methods include the use of rootwads from downed trees or limited use of large rock to deflect fast-moving water from erodible banks.
When unstable streambanks become vertical or undercut, they can be reshaped to a more gentle slope and stabilized with grasses and other vegetation. Most bioengineering methods must be adapted to site-specific circumstances. Before undertaking projects, landowners should contact NRCS or other sources for technical assistance.
How Much Does Streambank Stabilization Cost?
Cost Comparison and bank heights for different streambank stabilization methods*
| 100 linear feet of excavation, cedar tree revetments and native plantings | ||
| 4 feet high $788.00 |
8 feet high $1,135.00 |
12 feet high $1,695.00 |
| 100 linear feet of excavation, rootwads and native plantings | ||
| 4 feet high $550.00 |
8 feet high $945.00 |
12 feet high $1,570.00 |
| 100 linear feet of excavation and rock riprap to top of bank | ||
| 4 feet high $3,670.00 |
8 feet high $6,310.00 |
12 feet high $9,150.00 |
| 100 linear feet of excavation and rock riprap to 1/2 of bank height and native plantings to rest of the way up the bank | ||
| 4 feet high $2,570.00 |
8 feet high $4,050.00 |
12 feet high $5,775.00 |
Note: Keeping trees and shrubs on the streambank and keeping livestock out of the stream will help the long-term stability of these structures.
*These cost-estimates prepared by: Terry Horne, Bio-Environmental Engineer, USDA-NRCS
Frequently Asked Questions || Stabilizing Streambanks || Keeping Streams Healthy || Permits